enar
enar

Category

Feasibility Study @ar
relocation of paper mill from Austria to Saudi Arabia

مصنع الورق

 شحن وتركيب المصنع من النمسا إلى أحدى دول الشرق الأوسط
View Details

Green Gulf

/
Solar operates two factories in Yanbu, Saudi Arabia, one needs 750 MW and second facility 150 MW
View Details
Study to define solar power manufacturing from A to Z iin Saudi Arabia

Tadweer Aluminum plant

/
Operating and managing a recycling factory to produce Aluminium.
View Details

Viscose manufacturing facility

/ / /
Transferring and installing the viscose factory from Northern Europe to the Middle East.
View Details
CD factory from busienss plan to production

Wasaeet International Factory

/
Wasaet Int’l Company requested to develop a feasibility study and to apply for a loan from the government to establish an optical disc production facility in Saudi Arabia.
View Details